Future Ready Dairy Systems

Dairy Australia

header

Medium Scale Wind Turbine and Solar grid connect case study

The proposal looks at the feasibility of installing one Skystream 2.4 KW turbine with the possibility of installing more later or putting in one larger wind turbine and 14 meter tower in position close to the pumping system or at the factory. Both sites need to be assessed for solar output and wind speed.

There is also the possibility of installing a solar grid connect system at the factory.

The benefits are to offset power costs and to reducing carbon footprint.

The case study is to look at the costs and benefits in savings of power and carbon.

Download the document.